Announcement

author

Why the Permanent Baselines?

Posted by Paul Skuta on Mar 04 2014 at 04:00PM PST

Permanent baselines help us in many ways, not the least of which is how much time and white line marker is needed for all of our fields. Another issue with white line marker (AKA: chalk) is that the large amounts of chalky marker ultimately degrade and decondition the expensive dirt mixtures that we use on our fields. And finally, of course, permanent baselines are ALWAYS STRAIGHT, unlike manual applications.

The process of constructing the baselines is not simple. The plastic landscaping material used for the baselines are secured to a concrete foundation that is sub-surface. The first base line pictured here required 20 bags, or 1/2 yard of concrete! Anchor bolts are put into the concrete while wet in order to secure the baselines. Then the baselines are painted with a gritty, non-skid paint used in marine environments. The entire process for one field takes three men at least two full days of work of forming, pouring concrete, then securing the baselines.

image

Comments

There are no comments for this announcement.